Bellevue Electronics Lab and Data Center

BELLEVUE, WA – SWSG provided full-time on-site construction management and comprehensive AE design services for this 30,000 SF electronics lab – data center project. Bellevue included all new utility infrastructure, back-up power systems, chilled water HVAC, BMS system, and electrical distribution. The new facility was designed inside an existing shell warehouse as a “building-within-a-building”. The mechanical system includes CRAC cooling in the data center area. The new chillers include free-cooling modes of operation. SWSG provided design documents for a new building management system (BMS) allowing the contractor to install the wiring, conduit, and connections. SWSG’s construction manager and the BMS vendor worked closely to commission the system after installation.